“DATA MINING UNTUK ESTIMASI WAKTU PRODUKSI DAN PENGIRIMAN KOMPONEN PREFAB BERDASARKAN RIWAYAT PROYEK” (2025) Jurnal Media Akademik (JMA), 3(7). doi:10.62281/v3i7.2629.